Only One Main Door Per Unit: Teak Wood Frame Of 6″X4″ Inches With Teak Door Shutter – Per Door Including Fittings Upto Rs 24000/-
Internal Doors: Wpc Or Sal Frame Of 4″X3″ With Membrane Door Shutter – Per Door Including Fittings Like Handles, Locks, Aldrops, Hinges & Tower Bolts Upto Rs 8000/-
Only One Pooja Door Per Unit: Frame Of 5″X3″ Inches With Readymade Door Shutter – Per Door Including Fittings Upto Rs 12000/-
Extra Charges For Compound Wall If Less Than 3000 Sqft Of Construction
BBMP/BDA Or Any Other Approving Bodies For Liaison Work
Building Floor Level More Than 24″ Inches Height From The Road Level
Outside Ramping
Extra Sumping Depth
Any Interior Works Such As Wardrobe Or False Ceiling & Etc
External Cladding Work For Elevation
Extra Landscaping Work
Extra For Security Fabrication Works
Any Civil Works Outside House Area
Material Shifting Charges If Any Storage Problem
Additional Height Of Compound Wall
Only 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc., Are Not Inclusive
Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180
Only One Main Door Per Unit: Teak Wood Frame Of 6″X4″ Inches With Teak Door Shutter – Per Door Including Fittings Upto Rs 30000/-
Internal Doors: Wpc Or Sal Frame Of 5″X3″ With Laminate Door Shutter – Per Door Including Fittings Like Handles, Locks, Aldrops, Hinges & Tower Bolts Upto Rs 12000/-
Only One Pooja Door Per Unit: Teak Frame Of 5″X3″ Inches With Teak Door Shutter – Per Door Including Fittings Upto Rs 22000/-
Extra Charges For Compound Wall If Less Than 3000 Sqft Of Construction
BBMP/BDA Or Any Other Approving Bodies For Liaison Work
Building Floor Level More Than 24″ Inches Height From The Road Level
Outside Ramping
Extra Sumping Depth
Any Interior Works Such As Wardrobe Or False Ceiling & Etc
External Cladding Work For Elevation
Extra Landscaping Work
Extra For Security Fabrication Works
Any Civil Works Outside House Area
Material Shifting Charges If Any Storage Problem
Additional Height Of Compound Wall
Only 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc., Are Not Inclusive
Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180
Only One Main Per Unit: Teak Wood Frame Of 6″X4″ Inches With Teak Door Shutter Or Wooden Finished Steel Main Door – Per Door Including Fittings Upto Rs 45000/-
Internal Doors: Wpc Or Honne Frame Of 5″X3″ With Laminate Door Shutter – Per Door Including Fittings Like Handles, Locks, Aldrops, Hinges & Tower Bolts Upto Rs 15000/-
Only One Pooja Door Per Unit: Teak Frame Of 5″X3″ Inches With Teak Door Shutter – Per Door Including Fittings Upto Rs 32000/-
Extra Charges For Compound Wall If Less Than 3000 Sqft Of Construction
BBMP/BDA Or Any Other Approving Bodies For Liaison Work
Building Floor Level More Than 24″ Inches Height From The Road Level
Outside Ramping
Extra Sumping Depth
Any Interior Works Such As Wardrobe Or False Ceiling & Etc
External Cladding Work For Elevation
Extra Landscaping Work
Extra For Security Fabrication Works
Any Civil Works Outside House Area
Material Shifting Charges If Any Storage Problem
Additional Height Of Compound Wall
Only 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc., Are Not Inclusive
Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180